Testing connectivity
Use Test Connectivity to ensure that the Pega Platform node is connected to the CTI Server using the configured link parameters.
- The name of the CTI Link tested.
- Connectivity status to the ACD.
- The PRPC application that will process requests on the local CTI node.
- The results of the connectivity test.
- Any error messages that were generated.
Previous topic CTI Link configuration on Pega Platform Next topic Creating a dial plan