Configuring a Sample (deprecated)
Use a Sample to define a sample of the overall customer population. An Analysis Project takes a Sample and performs a range of statistical analysis activities to determine which data fields have predictive power or influence when measured against a goal, for example the purchase of a product or service.
Pega Customer Decision Hub
- Click .
- In the Sample populations tab, click Create.
- Enter the Sample name.
- Optional: Enter the Issue and Group to classify the Sample.
- Click Create and open.
- On the Design tab, in the About This Sample
Population section, configure the following information according to your
requirements:
- Sample Source - Describes the location of the sample data.
- Anticipated Sample Size - Describes the required size in terms of an absolute number (Fixed) or a percentage (for example, 10%).
- Sample Strategy - Describes various sampling strategies. For Ascending and Descending, use the Ordered On field to identify the field in the data set on which to order.
- In the Sample Fields section, clear any check boxes corresponding to fields which are not useful in analysis. As a general rule, fields that are system-related (for example partition key) or unique for individual customers (for example their customer id or their full name) typically have no value from an analysis perspective.
- Click Save.
- Run the Sample.
- To run the Sample manually:
- Click Run. The Run Sample pop-up window is launched.
- Click Confirm to populate the Sample. The Sample size field is updated to reflect the number of rows in the Sample.
- Click Preview to preview the contents of the Sample and its associated customer data.
- To run the Sample automatically, schedule the sample execution in the Schedule tab. Sample scheduling works in the same way as Segment scheduling. For more information, see Optional: Configuring Criteria Segment Runs.
- To run the Sample manually:
- Optional: Click the History tab to see details of the Sample
population.
Previous topic Intelligent Segmentation Next topic Configuring Analysis Projects (deprecated)