Prorated repair order coverage cost
If a part is configured for prorated coverage in any of the warranty types, the part cost is calculated using the following formulas.
Repair order cost = prorated part cost (replaced part) + labor cost + miscellaneous cost
Prorated part cost = covered part cost * (prorated percentage/100)
The prorated percentage for a part against a warranty type can be configured using the GetProratedCoverage decision table. To configure prorated coverage see Configuring prorated warranty coverage.
Whenever a repair order is converted to a warranty claim, the cost details of the new or replaced part must be propagated from the repair order.
Previous topic Prorated repair order coverage cost Next topic Supplier claim amount