INC-185362 · Issue 668826
Keystore update properly revises the cache
Resolved in Pega Version 8.7
A keystore updated with the latest certificate was not getting reflected in the runtime and the old certificate was getting picked. In a multi-node environment when the new JKS is uploaded in one node, the changes are expected to be communicated to other nodes so that the cache can be cleaned up. In this case, investigation showed that the keystore label was in uppercase and the cache entry was not correctly removed. This has been resolved by adding an update that will convert the cache key to lowercase and maintain uniformity to ensure proper cleanup.
INC-199303 · Issue 690629
Guided Tour working from Actions menu
Resolved in Pega Version 8.7
After updating from Pega 8.4 to Pega 8.5, "Manage a Guided Tour" was no longer working under a local action when called from the Actions menu on a work object. An unspecified error message appeared in the tracer. Investigation showed there was a null pointer error caused by the menu being invoked on an invalid page, and this was traced to updated authentication requirements: registration at the portal is not reliable as it is thread-scoped and run only once. The thread name is not guaranteed to stay the same so subsequent invocations of the tour activities failed. This has been resolved by modifying the call registration function to handle the security issues related to the generation of the menu path.