Control group configuration for predictions

Valid from Pega Version 8.5

You can now configure a control group for your predictions in Prediction Studio. Based on the control group, Prediction Studio calculates a lift score for each prediction that you can later use to monitor the success rate of your predictions.

For more information, see Customizing predictions.

Enable business users to own parts of an enterprise application

Valid from Pega Version 7.1.6

Decision Manager functionality allows business users to own parts of an enterprise application within the boundaries defined by IT. PegaDM includes the Pega-DecisionManager ruleset that supports this functionality.

System architects define the boundaries for business users in the Decision Manager portal using revision management and proposition authorization facilities in Designer Studio. Access control is provided through custom roles, which system architects can create based on granular privileges. The Decision Manager portal provides business users with a controlled environment for the workflow, and the activities necessary to address the objectives of a revision.

Improved reliability of Visual Business Director

Valid from Pega Version 8.4

Improvements to the reliability of Visual Business Director (VBD) eliminate the impact of temporary access loss to the VBD cluster. The improvements include the ability to continue writing data to a VBD dataset while the corresponding server node is unavailable, enhancements to single-case data flows that write data to VBD, and a reduction in the VBD cache size.

For more information, see Eliminate the impact of temporary access loss to the VBD cluster (8.4).

Changes to the architecture of the Data Flow service

Valid from Pega Version 8.4

In Pega Platform™ 8.4, the architecture of batch and real-time data flows uses improved node handling to increase the stability of data flow runs. As a result, there are fewer interactions with the database and between the nodes, resulting in increased resilience of the Data Flow service.

If you upgrade from a previous version of Pega Plaftorm, see the following list for an overview of the changes in the behavior of the Data Flow service compared to previous versions:

Responsiveness

Nodes no longer communicate and trigger each other, but run periodic tasks instead. As such, triggering a new run does not cause the service nodes to immediately start the run. Instead, the run starts a few seconds later. The same applies to user actions such as stopping, starting, and updating the run. The system also processes topology changes as periodic tasks, so it might take a few minutes for new nodes to join runs, or for partitions to redistribute when a node leaves a run.

Updates to lifecycle actions

To make lifecycle actions more intuitive, the Stop action consolidates both the Stop and Pause actions. The Start action consolidates both the Resume and Start actions.

You can resume or restart stopped and failed runs with the Start and Restart actions. The Start action is only available for resumable runs and continues the run from where it stopped. The Restart action causes the run to process from the beginning. Completed runs can only be restarted. If a run completes with failures, you can restart it from the beginning, or process only the errors by using the Reprocess failures action.

Starting a run

New data flow runs have the Initializing status, and start automatically. You no longer need to manually start a new run, so the New status is now removed.

If there are no nodes available to process a run, the run gets the Queued status and waits for an available node.

Triggering pre- and post-activities

The system now triggers pre-activities on a random service node, rather than on the node that triggered the run.

The system triggers post-activities only for runs that complete, fail, or complete with failures. If you manually stop a run with the Stop action, the post-activity does not trigger. However, restarting the run with the Restart action triggers first the post-activity, and then the pre-activity.

You can no longer choose to run pre- and post-activities on all nodes.

Selecting a node fail policy

For resumable runs, you can no longer select a node fail policy. If a node fails, the partitions assigned to that node automatically continue the run on different nodes.

For non-resumable runs, you can choose to restart the partitions assigned to the failed node on different nodes, or to fail the partitions assigned to the failed node.

No service nodes and active runs

If the last data flow node for an in-progress run fails, the run remains in the In Progress state, even if no processing takes place. This behavior results from the fact that data flow architecture now prevents unrelated nodes from affecting runs.

Response timeout configuration for predictions

Valid from Pega Version 8.5

You can now set a response timeout for your predictions in Prediction Studio. By setting a response timeout, you control how Prediction Studio registers customer responses that later serve as feedback data for your predictions.

For more information, see Customizing predictions.

We'd prefer it if you saw us at our best.

Pega.com is not optimized for Internet Explorer. For the optimal experience, please use:

Close Deprecation Notice
Contact us