SR-B57565 · Issue 316702
Fixed encoded special characters in 'Field values'
Resolved in Pega Version 7.3.1
Special characters in 'Field values' were being displayed as encoded in the grid. This was due to missing handling, and has been fixed in the generateCellContent RUF.
SR-B74088 · Issue 324942
Enhancement for Optimizing Packaging during full & delta sync
Resolved in Pega Version 7.3.1
As part of an enhancement for more contextual, optimistic packaging algorithm in certain conditions, packaging can be optimized based on a setting available at the case type. For example, most Field Service applications where offline capability is heavily used don't have or need the ability to instantiate or create new cases, but rather work on existing assignments routed to the agents. Some sites have the additional constraint where the case types or the flows within a case type may be large in number and dynamically created, which means the first full sync will just not be sufficient for the user to work on later created assignments. This has an adverse impact on the performance of the full sync and the first login time. The following changes have been introduced: - On delta sync - if a new work item ( of new case type which is not there during full sync packaging ) is added to work list. All the dependent rules of this new case type will be packaged and sent to HC. Added an checkbox in the case type rule "Only offline when in user's worklist" which will be visible only when "Enable Offline" is checked. - Provided a new when rule pyPackageAssignmentFlows which is set to false by default. When the true, all the case type with "Only offline when in user's worklist" will have selective flow packaging. - Create a class structure with a page group to hold full packaging and optimized packaging Application.pyOfflineCaseTypes("full") Application.pyOfflineCaseTypes("optimized") Above properties are populated in pzGetStartingFlows activity which is ran on delta sync and full sync. - Flows that are created in the case with "Only offline when in user's worklist" check are listed in pzDataSyncGetworkList which will be packaged during delta sync. The flows are listed for packaging if there is any Work Object created, flow is retrieved from the Assignment's pzInsKey key, and Flow key is built. Changes are made in the PackageRuntime.java to iterate the flow and perform packaging.