SR-D88057 · Issue 549112
Calculation logic updated for SLA with Goals and Deadline
Resolved in Pega Version 8.4.1
The DateTime control was displaying the date reduced by one day in runtime if it was configured with an SLA using Goals and Deadline. This has been resolved by removing the seconds and milliseconds in the calculation.
SR-D91030 · Issue 550797
Date time control custom length honored
Resolved in Pega Version 8.4.1
A custom length for the date time control in the Presentation tab was not working. Investigation showed that the Span tag containing the date time controls input box was missing a display:inline-block style attribute, causing the input box to overflow the span tag so the width was set to 100% by default if the date time control had any custom width configured. This has been corrected.