Show
all
C-1067 Click the Where-am-I? icon () on a worklist or the equivalent
Where-am-I? button () on a work object form to view, in a
separate window, the Visio diagram of the current flow rule, with a
larger arrow marking the current assignment.
This display shows the stack of one or more
incomplete flow executions in progress that lead to a specific assignment
or other incomplete shape in the flow. It does not show the entire work object
history, which may involve other flow executions now completed.
Only users who hold the
Work-.Perform privilege can display and interact with the
diagram. B-17011 SR-1430
If your application is localized, the labels on
this display are localized. GRP-197 5.5
Basics
This window has three panels:
- The top panel contains one or more flow names, identifying the
current flow execution in progress and parent flows. Completed
flows and parallel in-process flows do not appear.
- The left panel contains an image of one flow rule (in Visio
diagram form), with a golden arrow marking the current assignment
or other shape.
- The right panel contains selected details from the history of
this work object.
Top
panel
The top panel presents flows in the current flow stack. The
flowstack is the current list of flow rules in process
for a current shape. It does not include completed flow executions, or
other executions operating on this work object in parallel to the
current execution.
The flow at the top left was started first, and in most cases is
the flow that created the work object. Each flow is the parent of the
next subflow presented. The flow at the bottom left is the subflow
that contains an incomplete assignment.
Click a flow name to select it and view details in the left and
right panels. The selected flow name has a Yellow background.
Left panel
The left panel contains an image of the Visio diagram for the flow
selected.
A golden arrow () identifies the current shape, typically an
assignment.
Click Show
All Steps if
visible to mark each complete assignment plus the current assignment
with a yellow check mark. B-20188 rejectedB-19973
rejected Click Hide All Steps to
hide these check marks.
Click Open Flow to open the flow rule in
the main portal window. (This button is visible only when the
Where-Am-I? display is opened from the Designer Studio.)
Right
panel
The right panel displays selected items from the history of the
work object, for the flow that is selected (and marked with a
Yellow background) in
the top panel.
For assignment shapes, the display includes:
- The date and time the assignment was created (or that the
router shape was executed, if a router shape is associated with the
assignment)
- The operator who performed the assignment
- The connector flow action that completed the assignment
- The date and time the assignment was completed.
For other shapes, the contents of the right panel depend on history
options in the flow rule.
Portals in applications